Blyth results
27-01-2010 by Dimitra Spatharidou
We have tested our full scale wind engine at the Port of Blyth in Northumberland, a site renowned for wind power prototype proving. The results of these tests are to be released via a joint press release with Lloyd?s Register in the Lloyd?s List newspaper some time in April 2010.
All we can say is.. it works and we are progressing the design for sea trial later this year. Watch this space.
